West Hampstead Thameslink Station is being transformed as Network Rail installs a fully accessible footbridge with lift access to all four platforms.
Read moreThe Farringdon to Moorgate branch line, which dates back to 1868, will close permanently to passenger service when the new timetable is introduced on 22 March 2009.
Read moreThe new 22 March 2009 timetable permanently removes First Capital Connect Thameslink route services to and from Moorgate and Barbican.
Read moreThat's because Network Rail is lifting in a new covered footbridge at West Hampstead. It will have lifts to all platforms and make it easier to interchange with the Tube. It will also ease passenger movement around the station ready for new, longer 12-carriage trains, which will enter service between 2012 and 2015 as part of the Thameslink Programme.
Read moreNetwork Rail’s contractors have been making good progress installing a new passenger footbridge at Farringdon station.
Read moreTwo striking rainbow-striped trains were yesterday named at London Blackfriars station as part of a campaign to tell passengers about the massive £5.5 billion capacity upgrade of the cross-London Thameslink route.
Read moreTrain operator First Capital Connect has finished extending a depot ready to stable and maintain a new fleet of air-conditioned trains that will boost capacity and introduce new levels of comfort to the Bedford to Brighton Thameslink route.
Read moreFirst Capital Connect’s latest trains to emerge from a major internal refit are wearing a bright new livery to spread word about capacity upgrade works on the cross-London Thameslink route between Brighton and Bedford.
Read moreThe multi-billion pound Thameslink upgrade programme moved a step closer to completion today as Network Rail finished work to extend the platforms at First Capital Connect-managed station Luton Airport Parkway.
Read moreSignificant changes, in particular to services between Farringdon and Barbican and Moorgate, are included in the new winter timetable which comes into force on the Thameslink route on Sunday 14 December 2008.
Read more



Alternative travel arrangements
Suggested routes to help you on your journey.
Subscribe to email updates
Stay up-to-date with the Thameslink Programme developments by signing up to receive the latest news by email.
Accessibility
How will the Thameslink Programme affect access to and from stations?