The close out phase revealed inefficiencies in the planning and management of the delivery of as-built information at the end of the London Bridge project. Noncompliance of the final deliverables to Network Rail standards led to re-work and minor delays, proving costly.
This case study provides recommendations, based on the direct experiences of the London Bridge Station Redevelopment project team, that will result in a more systematic and efficient delivery of as-built drawings.