Design Integration

Design Intregration Case Studies

Door Design, Procurement & Installation: London Bridge station

The challenge of doors in large operational project at London Bridge station

Vierendeel Truss Installation: London Bridge station

Reviewing the key challenges, programme of works, methodology and logistics associated with installation of the Vierendeel truss at London Bridge station.

Wayfinding: London Bridge Station

This case study, from design and wayfinding contractor Maynard Design, explains how wayfinding solutions were adapted to keep passengers moving around the station as routes changed on a regular basis during the project’s construction phases.

Lessons Learned Summary: Bermondsey Dive Under

Key lessons from what went well on the project including: integrated planning and relationship management, management of third party relationships, integrated working, change management, Value Engineering and scheme handback and close-out. The case study also looks at what could have been improved, including contract content, contract administration and rework/redesign costs, and proposes recommendations for future schemes.

Design & Execution Strategy: London Bridge Station

Reviewing the design and execution strategy including: Concourse & Bridges, Canopies & Platforms, Facades, Quadripartite Arcade and Arches.

As-Built Information Delivery: London Bridge Station

Recommendations for future projects to improve the planning, management and delivery of as-built information during the close out phase

Improving pedestrian flow during construction: London Bridge station

Lessons learned from challenges encountered during the operation of previous station configurations resulted in adoption of the successful ‘Dog Leg’ pedestrian flow plan in August 2016