New Product Approvals
New Product Approvals Case Studies
Door Design, Procurement & Installation: London Bridge station
The challenge of doors in large operational project at London Bridge station
ETCS Testing – Thameslink Core Area
ETCS testing took place during mid-week nights through the Thameslink Core Area, while adjacent lines were open to service traffic, in preparation for ATO to be enabled.
As-Built Information Delivery: London Bridge Station
Recommendations for future projects to improve the planning, management and delivery of as-built information during the close out phase
Partial Completion Form: London Bridge station
How the adoption of a Partial Completion Form improved assurance as the project reached close out stage
Mock Up: London Bridge Station
James Elford, London Bridge Project Director, Costain discusses the benefits of using scale or full size models to demonstrate the design, aesthetics and materials used on elements of the project.